LinerPlate shaft in Hettstedt For the construction of a concrete shaft in a factory building the trench was secured with a LinerPlate 4-flange circular profile. With construction progress the Hamco shaft was disas-sembled successively. |
![]() (Click here for more pictures.)
|
|||||||||||||||
|
New road overpass Niedersachsenstraße in Tostedt In the course of the construction of the road bridge and the adaptation of the traffic spaces of the Niedersachsenstraße in Tostedt an existing Armco culvert (1976) was extended by two special Hamco profiles SWA 77. This will ensure the new altitude and graeter width of the Nidersachsenstraße. The assembly took place on one side in front of the existing building. The first extension section was pulled completely through the existing building on a jobsite-assembled wooden rail. The space between old Armco building and new Hamco building was filled in stages with liquid concrete. |
![]() (Click here for more picures.)
|
|||||||||||||||
|
SBA Leipzig, B 2 – BW 32A over pedestrian and bycicle path south of Zwenkau
n the course of the federal road B2 south of Zwenkau it was necessary to rebuild an existing dilapidated buidling over the pedestrian and bycicle path. It was replaced by a corrugated steel structure through its short construction time blocking the federal road and the resulting need for diversion could be reduced to a minimum. The special color scheme was achieved by a jobsite top coating. |
![]() (Click here for more pictures.)
|
|||||||||||||||